psiLynx

Project Reports

Saved snapshots of your entire project's performance at a point in time. Use them to document progress, share results with clients, or compare batches.

How to open

Go to the Reports tab in project navigation, then select Project Reports.

Generating a report

The Generate Report button is disabled if no completed batches exist yet. Run a check first.
  1. Click Generate Report.
  2. Configure the options in the dialog:

Snapshot batch (required)

Select a completed batch from the dropdown. The most recent is marked ★ (latest).

Compare with batch (optional)

Choose a second batch to compare against. When selected, a Comparison section is added to the report showing regressions and improvements.

Regression threshold

Appears when a compare batch is selected. Enter the number of Performance score points a URL must drop by to be flagged as a regression. Range: 1–50, default: 5.

Include in report

SectionDefaultDescription
Summary & averagesAlways includedHealth score, distribution bar, average metrics
Top opportunitiesOnMost common Lighthouse performance issues
DiagnosticsOffAdditional Lighthouse diagnostic checks
  1. Click Generate.

Report list

Each report entry shows:

  • Report title
  • Date range (start – end)
  • Generation date

Action buttons

IconAction
Open and view the report
/ Copy existing share link, or create a new one
Delete report (cannot be undone)

What's inside a report

For a full breakdown of every section in a generated report, see Report Detail.

Last updated July 20, 2026